About the Park
Phase II
Progress Photos
Location Advantages
Accessibility
Workforce
Industrial Market Overview
Downloads
In the News
Contact
Project Team
Inquiries
Building A & B Specs
32’ clear height
2,000 amps, 277/480 volt, 3-phase, 4 wire
ESFR sprinkler system
Z-guard track guards at all dock and grade-level doors
Skylights (2.5%)
±3,300 SF speculative office in each building
60’ concrete apron
Tilt-up concrete construction
Download Site Plan
Building A
±126,204 SF, divisible
23 dock-high
doors
(1 per 5,487 SF)
2 grade-level doors
Building B
±84,145 SF
16 dock-high doors (1 per 5,259 SF)
1 grade-level door
Parking
Option for secure parking
Additional trailer storage possible
Zoning
Zoning - I-G (General Industrial) San Joaquin County
About the Park
Phase II
Progress Photos
Location Advantages
Accessibility
Workforce
Industrial Market Overview
Downloads
In the News
Contact
Project Team
Inquiries